GE Manufacturing Plant Uses AnyLogic for Real Time Decision Support

Overview:




In 2012, GE opened a new battery manufacturing plant in conjunction with the launch of an innovative energy storage business. The new Durathon battery products, which are half the size of conventional lead acid batteries, but last ten times longer, are the result of GE’s $100 million initial investment in battery technology developed at GE’s Global Research Center (geenergystorage.com, 2014). Expanding the facility doubled production, added 100 new jobs, and brought the total factory workforce to 450 when at full capacity (geenergystorage.com, 2014).


Problem:




GE’s exciting opportunity brought on many new challenges, such as increasing production throughput and yield under evolving processes and uncertainties, and reducing manufacturing costs in order to gain market share. With over 27,000 variables tracked daily, GE was equipped with a lot of data, but they lacked the means to answer questions, analyze the data properly, or test and evaluate options.


The GE Global Research Center sought out a powerful and flexible tool to analyze, not just the specific process, but the manufacturing system as a whole.


Solution:




GE chose simulation modeling because it offered a dramatic return on investment, and simulation enabled the visualization of their system over time. The long term impacts could be evaluated with increased accuracy compared to using traditional computational, mathematical methods.


Full plant simulation development process
 

Full plant simulation development process



AnyLogic modeling and simulation software was chosen for its agent-based and multimethod modeling capabilities. It allowed GE to solve problems in any area, combine models, input multiple data sources, and run models anywhere for complete collaboration and real time decision making.


GE’s simulation models, built in AnyLogic, focused on determining baseline capacity with variability, simulating system dynamics, identifying bottlenecks, planning production ramp-up, guiding expansion, facilitating continuous improvement, evaluating P/E investment, and achieving real time production optimization.


Input Data: 

  • Process flow 
  • Type of machine (continuous, batch, single machine, and special machines including tube press and kiln) 
  • Machine cycle time 
  • Yield 
  • Machine MTBF/MTTR 
  • Staffing plan 
  • Setups, cleaning or special non-std work 
  • IPK’s

Outcome:




GE’s full plant simulation modeled manufacturing flow, and it was used for capacity planning (identify, evaluate, and prioritize projects), quantitatively analyzing bottlenecks, and evaluating improvement options. Real time operational decision support allowed GE to answer questions such as, “Do I need an additional operator in the next eight hours?”, quickly, simply, and accurately, by running what-if scenarios and optimizing results.

Manufacturing simulation model


AnyLogic software gave GE the tools to make the right probabilistic and multi-scenario informed decision, which resulted in clear visibility of day-to-day operations, increased production throughput, and decreased manufacturing costs.


Watch the video of Shanshan Wang, an Operations Researcher from GE Global Research, presenting this project at the AnyLogic Conference:


More Case Studies

  • Shipyard Capacity Analysis
    With AnyLogic simulation software as the centerpiece, NASSCO utilizes a custom-built analysis system called the Large Scale Computer Simulation Modeling System for Shipbuilding (LSMSe) to provide highly detailed and accurate capacity analyses for both current production and potential new work.
  • Production Planning in Marine Industry
    The managers of one of the most important Italian yacht manufacturers needed a new, intelligent approach that would make the planning process simpler. The objective was to give the real production planner exceptionally rich planning information, which would allow the person to test and refine a plan before its implementation.
  • Simulating Ice Cream Production: Recognizing Constraints and Optimizing Production Plan
    Conaprole, the biggest dairy production company in Uruguay, produces more than 150 SKUs in their ice cream plant, using five production lines, and up to five different packaging configurations for each line. The management’s challenge was to be able to reformulate their plans in order to balance supply and demand and make sure they would avoid stock-outs in key products. They also sought ways to optimize the use of their production capacities.
  • Simple Simulation Model Helps Intel Avoid Production Plant Downtime
    Intel factories used a particular type of equipment that often broke down, which caused capacity constraints. These expensive parts were used in critical factory operations, and the repairs took significant time, so it was necessary to have extra spare parts on hand to avoid downtimes. Broken parts caused constraints at some of the factories while other factories over purchased spares.
  • Improving Mining Outbound Logistics with Agent-Based Simulation Modeling
    One of the largest resource companies in the world, with over $80 billion in sales, decided to enter a new market. It was planning to build a new potash mine with 90% of the resources exported. They wanted to design a reliable supply chain, with a high speed of supply replenishing, and the ability to recover from natural disasters and man-made crises benefiting from such volatility. Amalgama and Goldratt companies contracted this project to design the potash mining operations and a full supply chain of outbound logistics.
  • Modeling and Optimization of Oil Production Using AnyLogic Fluid Library
    Canada is the third largest country to have oil reserves. However, most of the oil is in oil sand – the mixture of sand, oil, and water – which has to be heated up with steam to emit the oil. It is costly to maintain such a distribution system, and outages may lead to disruptions in steam injection and oil production. Stream Systems company applied AnyLogic simulation modeling to optimize expenditures and capture production lags
  • Highly Automated Production Line Planning and Optimization
    Centrotherm Photovoltaics AG is a global supplier of technology and equipment for the photovoltaics, semiconductor, and microelectronics industries. The company needed to identify the best automated production line and factory configuration to minimize costs and maximize throughput and reliability.
  • Simulation of the Construction of a Tunnel with a Tunnel Boring Machine
    The cost of one hour of down time of a tunnel boring machine is usually high and project managers have to do their best to avoid unnecessary delays in construction. The aim of the simulation project, which was carried out at Ruhr University Bochum in Germany, was to create a simulation model that would be capable of determining the bottlenecks in tunnel building processes in order to minimize the possible monetary losses.
  • Shipyard Proves Order Fulfillment Capability and Gains Visibility into Production Facility and Distribution
    Faced with a large order for diesel powered submarines, Admiralty Shipyards JSC must evaluate whether the current production facilities can fulfill the order, and if not, what amount can be produced by the year 2016. Admiralty Shipyards JSC is also seeking confirmation that an additional production facility will not be needed to complete the order.
  • Analysis of Management Strategies for the Aircraft Production Ramp-up
    The Airbus Group joined the European Union ARUM (Adaptive Production Management) project, which is focused on creating an IT solution for risk reduction, decision-making, and planning during new product ramp-ups. The project is aimed mainly at aircraft and shipbuilding industries. Simulation was chosen as a part of the ARUM solution, because it would allow the participants to reproduce the real production facility experience.